Header

UZH-Logo

Maintenance Infos

Browse by Creators

Navigate back| Up a level
Export as
Number of items: 3.

Adam, W; et al (2009). Alignment of the CMS silicon strip tracker during stand-alone commissioning. Journal of Instrumentation, 4(7):T07001.

Adam, W; et al (2009). Performance studies of the CMS Strip Tracker before installation. Journal of Instrumentation, 4(6):P06009.

CMS Tracker Collaboration; Adam, W; Bergauer, T; Dragicevic, M; Friedl, M; Fr├╝hwirth, R; et al (2009). Stand-alone cosmic muon reconstruction before installation of the CMS silicon strip tracker. Journal of Instrumentation, 4(05):P05004.

This list was generated on Mon Feb 19 10:26:43 2018 CET.